Points of View: Optimistic or Cautious Holding-Time Assumptions?
Holding time drives carrying costs, financing costs and risk. Analysts tend to fall into two camps on how to set it. This page sets out each camp's reasoning, without quoting anyone.
The optimistic camp
Reasoning: competitive markets reward the offer that can pay most. If you assume long holds, you will be outbid by people who assume shorter ones. Good project management shortens holds.
Strengths: competitive offers; reflects best-case execution.
Risks: few projects run to best case; the end buyer may correct it, and the deal stalls.
The cautious camp
Reasoning: most delays are outside your control: contractor starts, permits, weather, slower resale. Building them in protects the end buyer and your credibility.
Strengths: fewer failed deals; trusted numbers.
Risks: losing some deals to more optimistic bidders.
What the numbers show
| Hold assumption | Effect on MAO (hypothetical) |
|---|---|
| Four months | Baseline |
| Six months | About two months of carrying cost lower |
| Eight months | About four months lower |
The difference is real money, which is why the debate matters.
A synthesis many analysts use
Build the hold from parts, using written contractor start dates and an agent's observed days on market, then round up. Present the deal at that hold, and show what MAO would be at a shorter hold so a confident end buyer can see the upside.
Credibility over time
End buyers remember who sends realistic numbers. An analyst whose holds consistently match outcomes builds a reputation that wins deals even when another analyst's headline figure is higher.
A hypothetical example
Two analysts bid on House H. One assumes four months, the other six. The end buyer, who has worked with both, uses the second analyst's figure, because past deals from the first ran long.
Where delays usually come from
In renovation projects, delays tend to cluster in a few places: the wait for a contractor to start, permit and inspection scheduling, materials with long lead times, scope that grows once walls are opened, and resale periods that run longer than expected. A cautious analyst assigns time to each; an optimistic one assumes each goes smoothly. Neither knows the future, but only one is planning for the ordinary course of events.
Making the assumption visible
Whichever approach you choose, state the hold on the deal sheet with its parts. A buyer who sees "two weeks to start, ten weeks of work, six weeks on market" can adjust one part they disagree with instead of discounting the whole sheet.
WholeSellTX offers this comparison for general education. See estimating how long you will hold.