Building and Calibrating a Local Repair Price List
A repair estimate is scope times price. Scope comes from the walk-through; price comes from somewhere, and too often that somewhere is a number remembered from another city or an old project. A local price list, kept up to date, makes every estimate faster and more consistent. This guide shows how to build one and keep it honest.
Structure of the list
One row per scope item, priced in the unit a contractor would use.
| Item | Unit | Current price | Source | Date | Range seen |
|---|---|---|---|---|---|
| Interior paint, walls and ceilings | Per sq ft of floor | P | Bid, invented contractor X | Month/year | Low–high |
| LVP flooring installed | Per sq ft | P | Two bids | Month/year | Low–high |
| Stock kitchen cabinets installed | Per linear ft | P | Invoice | Month/year | Low–high |
| Water heater replaced | Each | P | Bid | Month/year | Low–high |
| Roof tear-off and shingle | Per square (100 sq ft) | P | Bid | Month/year | Low–high |
The P placeholders are deliberate: this site does not publish prices, which vary by place, time and contractor.
Building the first version
- Collect every bid and invoice you have from the area, with dates.
- Break each into unit prices where the bid allows.
- Where you have several data points, record the median and the range.
- Mark items with only one data point as low confidence.
- For items with no local data, use a published construction cost reference with a regional adjustment, and mark the source.
Calibrating over time
- After each bid: compare the bid with what your list would have predicted. Update the price if the difference is consistent across bids.
- After each project you can see the invoices for: record actuals beside estimates.
- Quarterly: check which items drift most; materials such as lumber and roofing can move faster than labour.
A hypothetical calibration
An invented list prices LVP flooring at P = 5.00 per square foot installed. Three new bids come in at 5.60, 5.80 and 5.50. All three are higher, so the list moves to the median, 5.60, with a range of 5.50 to 5.80, and the date is updated. On a 1,200 square foot floor the estimate rises by 720. Small per line, but across twenty lines similar drift can add several thousand to an estimate that would otherwise look precise.
Using the list in an estimate
- Price each scope line from the list.
- Carry the list's confidence into the estimate's confidence column.
- Where a line uses an item with only one data point, it deserves a wider contingency range.
- Note the list version on the deal sheet.
Common mistakes
- Never updating; a list from two years ago can be well off.
- Mixing material-only and installed prices.
- Recording a bid's total without breaking out units, which makes it unusable for the next house.
- Treating the list as a bid; contractors price the actual house.
Who does the work
Pricing a line is not the same as being qualified to do it. Licensed trades in Texas, such as electrical and air conditioning work, are licensed through TDLR, and many cities require permits. The trade credentials page explains how to check.
This guide is general education on estimating practice with placeholder prices. Real prices come from local bids and change over time.