Companion Notes: How to Read a Comp Grid, Row by Row

These notes accompany a narrated lesson in which someone reads a completed comparable-sales grid aloud and explains what they see. No video is embedded here. The aim is to practise reviewing someone else's ARV, which is a different skill from building your own.

Part 1: Read the subject column first

Before looking at any comp, read what the grid says the subject will be after the work: size, rooms, garage, lot, condition. If the description of the finished house is vague, every adjustment that follows rests on sand. Ask: does this match the repair scope?

Part 2: Read the raw prices and dates

Scan the sold prices and how long ago each sale closed. A wide spread in raw prices is normal; it is what adjustments are for. A sale much older than the others is a flag, because it will need a time adjustment the grid may not support.

Part 3: Read each adjustment row

Read across one feature at a time rather than down one comp at a time. For each row, ask:

Part 4: Read the net and gross adjustment totals

Net adjustment is the sum with signs; gross adjustment is the sum of absolute values. A comp with small net but large gross adjustments has offsetting differences, meaning it is really quite different from the subject even though the final number looks close. Give such comps less weight.

Part 5: Read the reconciliation

The grid should end with a single figure and a sentence explaining the weighting. If the final ARV equals the highest adjusted comp, ask why the others were set aside.

A hypothetical grid to practise on

Invented numbers for practice only.

RowComp AComp BComp C
Sold price250,000262,000241,000
Size adjustment0−7,000+4,000
Garage adjustment00+8,000
Condition adjustment−5,00000
Net adjustment−5,000−7,000+12,000
Gross adjustment5,0007,00012,000
Adjusted price245,000255,000253,000

Practice questions:

  1. Which comp deserves the most weight, and why?
  2. Comp A was adjusted down for condition. What does that say about its finish compared with the planned renovation?
  3. Comp C needed the largest gross adjustment. Would you keep it?

Suggested answers: Comp A has the smallest gross adjustment and could carry the most weight; its downward condition adjustment means it was finished to a higher standard than planned for the subject; Comp C is usable but deserves less weight. A reconciled figure near 249,000 to 251,000 would be defensible.

Part 6: Where to be sceptical

For building a grid yourself, see the adjustment tutorial.

These notes help readers learn to review an estimate. They do not make anyone an appraiser; in Texas an appraisal comes from a TALCB-licensed or certified appraiser.