Benchmarking Your Own Forecasts: ARV, Repairs and Days Held
Every offer you write rests on three forecasts: what the finished house will sell for, what it will cost to get there, and how long the money will be tied up. Nobody publishes a reliable benchmark for those forecasts that fits your market and your habits, and borrowed industry averages tell you little about your own judgement. The only benchmark worth keeping is the one you build from your own files, comparing what you predicted with what eventually happened.
What to record, and when
The discipline is to freeze the forecast before you know the answer. Save the deal sheet on the day you submit the offer, with the date, the three forecasts and a note on the evidence behind each. Later, when the end buyer closes the resale or shares a final cost figure, add the outcome beside it. Where you never learn the outcome, mark the file as unresolved rather than guessing; a benchmark padded with assumed results flatters you.
| Field | Recorded at offer | Recorded at outcome |
|---|---|---|
| ARV | Your estimate and the comps used | Recorded or reported resale price |
| Repairs | Line-item total and contingency | Final spend reported by the buyer |
| Hold time | Expected months from purchase to resale | Actual months |
| Evidence grade | Strong, fair or weak | Not changed afterwards |
Three measures that tell different stories
Error is the outcome minus the forecast, divided by the forecast. A repair forecast of 40,000 that ended at 46,000 has an error of plus 15 percent. Keep the sign, because the direction matters.
Bias is the average of those signed errors across many files. If your repair errors average plus 10 percent, you are not unlucky; you are systematically light, and the fix is to raise estimates, not to hope for better luck.
Spread is how far individual errors scatter around the average. A small bias with a wide spread means you are right on average but cannot be trusted on any single house, which argues for a bigger contingency rather than a different price list. Using the median error alongside the mean helps here, because one disastrous file can drag the mean a long way.
A hypothetical log of five files
The numbers below are invented for illustration only.
| File | Repair forecast | Repair outcome | Error |
|---|---|---|---|
| A | 30,000 | 33,000 | plus 10 percent |
| B | 45,000 | 44,000 | minus 2 percent |
| C | 20,000 | 26,000 | plus 30 percent |
| D | 60,000 | 63,000 | plus 5 percent |
| E | 35,000 | 38,500 | plus 10 percent |
The mean error is roughly plus 10.6 percent and the median plus 10 percent, so the bias is real rather than the product of one outlier. File C stands out; reviewing it might show that the evidence grade was weak, which is a reason to apply a larger allowance whenever the walkthrough was limited.
Turning the benchmark into better offers
- Split errors by evidence grade. Forecasts made from a full walkthrough and a contractor bid should earn tighter contingencies than ones made from photos.
- Split repair errors by category. Bias concentrated in plumbing or foundation lines points to a specific gap in your price list.
- Compare hold-time errors with the season of purchase, since closings near holidays and year end often slip.
- Review the log every quarter, not after every file, so one surprise does not swing your method.
Five files are too few to prove anything; treat the first year of entries as a rough signal and let the sample grow. Feed the corrected habits back into the repair estimate builder and your assumptions log.
This page explains a record-keeping method for education only; it is not a forecast for any property and not financial advice.