Repair Estimate Builder, Line by Line
This page is a repair estimate builder in worksheet form. There is no interactive form; copy the layout into a spreadsheet or onto paper. It turns a walk-through scope into a priced estimate with a confidence rating per line and a reasoned contingency. Every price shown is invented; use your own local figures.
The columns
| Column | What goes in it |
|---|---|
| Group | Systems, rooms or exterior |
| Scope | What will be done, in plain words |
| Quantity and unit | For example 1,200 sq ft, 18 linear ft, 1 each |
| Unit price | From a bid, invoice or calibrated price list |
| Line total | Quantity × unit price |
| Confidence | High, medium or low |
| Evidence | What you saw, or "not accessed" |
A worked invented example
| Group | Scope | Qty | Unit price | Total | Confidence |
|---|---|---|---|---|---|
| Systems | Replace roof, tear-off one layer | 18 squares | 550 | 9,900 | Low: no attic access |
| Systems | Replace HVAC condenser and air handler | 1 | 7,800 | 7,800 | Medium: unit dated |
| Systems | Replace water heater | 1 | 1,600 | 1,600 | High |
| Rooms | Kitchen: new stock cabinets | 20 lin ft | 240 | 4,800 | High |
| Rooms | Kitchen: counters | 42 sq ft | 55 | 2,310 | High |
| Rooms | Two bath refreshes | 2 | 3,600 | 7,200 | High |
| Rooms | LVP flooring | 1,350 sq ft | 5.2 | 7,020 | High |
| Rooms | Interior paint | 1,350 sq ft | 3.8 | 5,130 | High |
| Exterior | Trim repair and paint | 1 | 3,500 | 3,500 | Medium |
| Permits | Mechanical and building | 1 | 1,200 | 1,200 | Medium |
| Subtotal | 50,460 |
Adding contingency
Use the method from the contingency how-to. With invented ranges of 0.05 for high, 0.15 for medium and 0.40 for low:
- Roof upside: 9,900 × 0.40 = 3,960
- Medium lines: (7,800 + 3,500 + 1,200) × 0.15 = 1,875
- High lines: (1,600 + 4,800 + 2,310 + 7,200 + 7,020 + 5,130) × 0.05 = 1,403
- Largest single upside plus half the rest: 3,960 + 0.5 × 3,278, about 5,600
Estimate: 50,460 + 5,600 = about 56,100.
Checks before using the total
- Every major system has a line or a note saying why none is needed.
- Quantities agree with your measured floor plan; see the floor-plan tutorial.
- Unit prices are dated and local.
- Low-confidence lines are flagged for verification.
- The estimate was built without looking at the target offer.
Using the result
The total feeds line B of the MAO calculator worksheet. The roof line is the obvious candidate for a pre-offer bid: if a roofer confirms it, the contingency drops by most of 3,960 and the stress case narrows.
Where the site's interactive estimator fits
The rehab cost estimator offers ticking items room by room. Its built-in prices are placeholders; this worksheet is the place to apply your own.
Why separate lines beat a single total
A single figure for "repairs" cannot be tested, compared with a bid or improved next time. Separate lines can. When the roofer's price comes in, you replace one row and the rest of the estimate stands. When an end buyer questions the budget, you can point to the line they disagree with instead of defending a lump sum, and over several deals the lines become the raw material for a price list grounded in your own area.
The prices and quantities here are invented. This builder is a general learning tool, not a construction bid, and licensed trades should price and perform regulated work.