Deal Math 3: Building the Repair Line
The repair line is where the most judgement hides. Part 3 builds it for House 1 from a walk-through, with every figure hypothetical.
Step 1: Scope
List each item with location, quantity and finish level matching the ARV in Part 2. For House 1: kitchen cabinets and counters, flooring in living areas and bedrooms, interior paint, two bathroom refreshes, water heater, electrical repairs and fixtures.
Step 2: Quantities
Measure: square feet of flooring and paint, linear feet of cabinets, number of fixtures. Measured quantities beat guesses.
Step 3: Price
| Line | Quantity basis | Price source | Estimate |
|---|---|---|---|
| Kitchen | 18 linear feet | Recent bid | 13,000 |
| Flooring | 1,300 sq ft | Price list, dated last quarter | 8,000 |
| Paint | Whole interior | Price list | 5,500 |
| Bathrooms | Two | Recent invoices | 8,500 |
| Water heater | One | Supplier quote | 1,800 |
| Electrical | Panel repairs, outlets | Electrician estimate | 2,700 |
| Permits, disposal, cleanup | As required | Standard lines | 1,500 |
Step 4: Contingency by confidence
| Line | Confidence | Allowance |
|---|---|---|
| Paint, flooring | High | 600 |
| Kitchen, bathrooms | Medium | 1,300 |
| Electrical | Low | 1,100 |
| Total contingency | 3,000 |
Repair line total: 44,000.
Step 5: Exclusions and unknowns
State what is not included and what was not seen. For House 1, the attic was not accessed, so the sheet notes that roof decking and insulation are unverified.
Common mistakes
- Pricing a different finish level from the ARV comps
- Forgetting permits, disposal and cleanup
- Spreading contingency evenly regardless of risk
- Using undated prices
When to get a bid
If one line is both large and uncertain, a contractor bid or specialist report before offering may be worth its cost. See the debate on paying for inspections before offering.
The repair line on House 1's sheet
"Repairs 44,000 including 3,000 contingency sized by line confidence; kitchen from a recent bid; attic not accessed."
How repairs affect later parts
Repairs drive the hold length in Part 4 and the financing in Part 5, because lenders often fund repairs in draws.
Why finish level is the first decision
The comps that support ARV were finished to a particular standard. If House 1's scope prices builder-grade cabinets while the comps had mid-grade kitchens, the house may not reach the ARV in Part 2. If the scope prices high-end finishes the neighbourhood does not support, the extra spending may not be recovered. Agreeing the finish level before pricing, using photos or descriptions of the comps, keeps the repair and ARV lines consistent. Write that finish level at the top of the scope so any contractor who bids prices the same thing.
Continue to Deal Math 4. Figures are hypothetical; this is general education from WholeSellTX.