From Walk-Through Notes to a Priced Repair Estimate

A repair estimate turns observations into money. Done room by room, it keeps each decision visible and makes it easy to compare against a contractor's bid later. This guide walks through the method in full, with an invented house as the running example.

Why room by room beats a single rate

A per-square-foot rate assumes every house needs a similar mix of work. In practice, one house needs a roof and nothing else, while the next needs every surface redone and a sound roof left alone. Building the estimate from rooms and systems captures that difference. It also produces a document a contractor can respond to line by line.

The structure of the sheet

Organise lines into three groups:

  1. Systems: roof, foundation, electrical, plumbing, HVAC, water heater, sewer.
  2. Rooms: kitchen, each bathroom, bedrooms, living areas, laundry, garage.
  3. Exterior and site: siding, trim, paint, gutters, drainage, fencing, landscaping, driveway.

Each line gets a scope description, a quantity, a unit price, a total and a confidence rating.

Pricing a room: the kitchen example

For an invented kitchen of moderate size, a scope might read: remove existing cabinets and counters, install new stock cabinets, install new counters, new sink and faucet, new range, dishwasher and range hood, new flooring, paint, update lighting.

ItemQuantityHypothetical unit priceTotal
Cabinets20 linear ft2505,000
Counters40 sq ft602,400
Appliances1 set2,8002,800
Sink, faucet, plumbing connection1700700
Flooring180 sq ft61,080
Lighting and electrical1900900
Paint and drywall patch1600600
Demolition and haul-off1800800
Kitchen total14,280

These unit prices are invented for illustration. Real prices vary by region, finish level and contractor, and should come from local bids or a calibrated reference.

Pricing systems

Systems are usually single lines with large totals and lower confidence. If you cannot see the roof deck from the attic, say so in the scope and price a full replacement or a clearly stated allowance. For HVAC, the data plate on the unit gives its age; an old unit may be working today and still be a sensible replacement line for a buyer planning a resale.

Contingency

Add contingency based on the low-confidence lines. A hypothetical approach: zero to five percent on high-confidence cosmetic lines, and a larger allowance on systems you could not inspect. Write the reasoning beside the figure.

Permits and inspections

Many Texas cities require permits for electrical, plumbing, mechanical and structural work. Add the permit fees and allow time for inspections in the holding period. Trades such as electrical and air conditioning work are licensed by the Texas Department of Licensing and Regulation, which affects who can pull permits.

A complete hypothetical summary

GroupTotalLowest-confidence line
Systems21,500Roof
Rooms33,000Primary bathroom subfloor
Exterior and site6,500Drainage
Permits1,500
Contingency7,500
Estimate70,000

Checking the estimate

The walkthrough checklist is the companion for collecting the notes this guide prices.

This guide teaches a general estimating method with invented figures. It is not a bid, and any structural or safety concern should be assessed by a licensed professional.