Comparison: Three Ways to Estimate Repairs on the Same House
Repair estimates can be built three ways. Each trades speed for accuracy. This comparison applies all three to House E, a fictional 1,500-square-foot house needing a kitchen, flooring, paint and a water heater. All figures are invented.
Method 1: Per-square-foot allowance
The analyst uses a "medium rehab" allowance per square foot from their own past files.
| Input | Value |
|---|---|
| Allowance per square foot | 25 |
| Size | 1,500 |
| Estimate | 37,500 |
Method 2: Line-item estimate
| Line | Estimate |
|---|---|
| Kitchen | 15,000 |
| Flooring | 8,000 |
| Paint | 5,500 |
| Water heater | 1,800 |
| Minor repairs and fixtures | 3,000 |
| Contingency | 3,300 |
| Total | 36,600 |
Method 3: Contractor bid
A general contractor walks the house and bids 41,000, including permits and a cleanup line the analyst had not included.
Comparing them
| Factor | Allowance | Line-item | Bid |
|---|---|---|---|
| Time to produce | Minutes | An hour or two | Days |
| Needs a site visit | No | Yes | Yes |
| Captures specific issues | No | Mostly | Yes |
| Includes contractor overhead | Implicitly, maybe | Depends on price list | Yes |
| Best use | Screening | Offer pricing | Before committing, or for the end buyer |
What the gap tells you
The bid came in about 12 percent above the line-item estimate. The missing lines, permits and cleanup, are common omissions. The analyst adds them to the price list template so future line-item estimates include them.
A combined approach
Screen with an allowance, price the offer from a line-item estimate with a contingency sized to confidence, and get a bid for the largest uncertain items before the end of the inspection period.
See the repair estimate builder and the contingency how-to.
Keeping your allowance honest
A per-square-foot allowance is only as good as the files it came from. Keep a simple table of past projects with size, scope level and final cost, and update the allowance from it each quarter. When a new project does not fit any of your categories, for example a house with structural issues, do not use the allowance at all; go straight to a line-item estimate and a bid for the uncertain items.
Line items that are often missing
Permits, dumpster and disposal, final cleaning, appliance delivery, utility reconnection, small electrical items found during work, and drywall patching after plumbing repairs. Adding these as standard lines in the template is the simplest way to close the gap between estimates and bids.
When the bid is the number
If the end buyer will use the same contractor, their bid is the most relevant figure. If not, it is a check on your estimate rather than a replacement for it.
WholeSellTX offers this comparison as general education; figures are hypothetical, not local prices.