Discussion Starter: What Analysts Ask Most About Repair Estimates

These are the repair-estimate questions analysts raise most often, with short general answers and links. Figures are never typical prices; use local bids.

"Can I just use a cost per square foot?"

For screening, yes. For pricing an offer, build line items. A per-foot allowance cannot see that one house needs a sewer line and another does not. See three ways to estimate repairs.

"Where do I get prices?"

From recent local bids and invoices, recorded with dates. Supplier price sheets help for materials. National averages are a poor substitute for local prices.

"How much contingency?"

Size it by line confidence: more for uncertain items such as old plumbing, electrical and foundations, less for paint and flooring. See the contingency debate.

"Why are contractor bids always higher than my estimate?"

Often because of lines you did not include: permits, disposal, protection, code-required work, overhead and profit. Compare line by line before concluding the bid is high. See how contractors and analysts see scope.

"Should I include permits?"

Yes, where the work requires them. Check the city's requirements and fee schedule; permit waits also add to the hold.

"What about hidden damage?"

You cannot price what you cannot see, but you can price the probability. Expected-value allowances help for major unknowns; see pricing a foundation unknown.

"Do I need licensed trades?"

For electrical and plumbing work in Texas, generally yes, and some HVAC work requires licensing too. Bids should say which licensed trades will do the work.

"How do I keep estimates honest over time?"

Compare estimates with final costs and adjust the price list. See calibrating a repair price list.

"Should the end buyer's contractor bid replace my estimate?"

If the end buyer will use that contractor, their bid is the most relevant figure. Otherwise, use it as a check on your own estimate and explain any gap on the deal sheet.

"What finish level should I price?"

The level that matches the comps supporting your ARV. Pricing a lower standard risks missing the ARV; pricing a higher one wastes money that buyers may not pay back.

Quick reference

"How do I estimate when I cannot get inside?"

Some sellers allow only a brief look, or none before contract. Price from what you can see, use wider allowances for systems you could not inspect, and state on the deal sheet which areas were not seen. Plan to inspect fully during the option period and expect to re-price if the inspection finds more.

WholeSellTX answers in general terms for education only.